Pothole repairs scheduled for I-75

Pothole repairs scheduled for Interstate 75 in Madison County Southbound between mile points 73.0 and 84.0.
District 7 Madison County Maintenance Crew with the KY State Police. The Kentucky Transportation Cabinet (KYTC) advises motorists of scheduled pothole repair operations. Rolling road blocks will be utilized for the work.

Wednesday, Sept. 11 – 12 a.m. (midnight) until 6 a.m.
Interstate 75 – Southbound
Rolling roadblocks (a mobile operation) will be in effect for the following location:
• between milepoints 73.0 (the Madison-Rockcastle County line) and 84.0
The Southbound On Ramps (one ramp at a time) will be blocked for short periods (10 – 15 minutes):
• Exits 76, 77 and 83

The traveling public should expect delays during the hours of scheduled repair operations.

All work is scheduled on a tentative basis, and subject to change depending on weather, emergencies, and other factors beyond the control of the Department of Highways.

Leave a Reply